Status, roadmap and release state
Roadmap
Intended direction, no dates.
Status labels: Live (checked directly, dated) Built in code; not independently verified In progress Planned, not shipped Open decision or unverified Not offered / no claim made
C0955 What is planned next?
A public delivery route, a finished 0.1.3 release, working Sell-hat posting, confirmed preregistered seats and billing for the tentative buyer rate.
C0956 When will macOS arrive?
No macOS build is mentioned in any plan we saw. Treat it as not on the table until the owner says otherwise.
C0957 When will Linux arrive?
Same story: the Windows x64 portable is the only target described, and a Linux build has no mention.
C0958 When will Sell ship?
No date. Posting is refused today, and the offers layer holds zero.
C0959 When will there be a smaller install?
A smaller update path is coded through delta updates, but is not confirmed shipped, and the first install stays large.
C0960 Will prices ever appear?
Nothing suggests ET will become a pricing service. Figures remain labelled Opinion EstimatesWhat this label means A maker’s own figure, non-binding and for planning only. It is labelled maker-reported, is not verified by ET, and is not a quote or an offer to sell. A hard figure appears only if the maker opts in. ET invents no prices. Glossary entry for this label, and a hard figure would appear only if a maker opts in.
C0961 Will freight become real?
Truck, rail and air are null and the sea rate is a mock. There is no plan we can cite for real values.
C0962 Will you add an API?
No API appears in any plan we read. If one were ever built it would need its own licence review, since the data comes from sources with differing terms.
C0963 Will you add SSO?
Single sign-on for organisations is not on any plan we found. Sign-in stays with Google or a MiniStudios account.